Form ID: (MN501000)
You can use this form to review and mass-process material lines from multiple source documents—projects and work orders. You can create material issues, material shipments, or material transfers.
Depending on the option selected in the Action box, the system processes material lines as described below.
Form Toolbar
The form toolbar includes the buttons described below.
| Command | Description |
|---|---|
| Process | Initiates the processing of the material lines that you’ve selected in the table. |
| Process All | Initiates the processing of all material lines listed in the table. |
Selection Area
In this area, you can select the action to be performed and specify criteria to narrow the range of material lines listed in the table.
| Element | Description |
|---|---|
| Action |
The action to be performed on the processed material lines. The box is empty by default. The following options are available:
If you select Create Material Issue or Create Material Shipment, the system creates one material issue or shipment for all lines with the same source document and the same warehouse. It creates separate documents for lines that belong to different source documents or have different warehouses. If you select Create Material Transfer, the system creates one material transfer for all lines with the same source document and the same source and destination warehouses. The system also creates separate material transfers for lines from different source documents or with different combinations of source and destination warehouses. For lines being transferred between locations of the same warehouse, it creates one material transfer per source document. |
| Select By |
The type of date that the system uses to filter the material lines listed in the table. The following options are available:
|
| Date Range | The range of dates used to filter the material lines listed in the table based on the option selected in the Select By box. By default, no start date is specified, and the end date is the current business date. |
| Creation Date | The date to be assigned to the material issues, material shipments, or material transfers created during processing. By default, the box contains the current business date. |
| Document Type |
The type of source document for which material lines are listed in the table. Select one of the following options:
|
| Service Location | The service location for which material lines are listed in the table. This box appears if Work Order is selected in the Document Type box. |
| Document ID | The identifier of the source document for which material lines are listed in the table. The documents available for selection depend on the option selected in the Document Type box. |
| Project Task | The identifier of the project task for which material lines are listed in the table. This box appears if Project is selected in the Document Type box and becomes available when a project is selected in the Document ID box. |
| Warehouse | The warehouse from which the materials are to be issued, shipped, or transferred. |
| To Warehouse | The destination warehouse to which the materials are to be transferred. This box appears if Create Material Transfer is selected in the Action box and the Multiple Warehouses feature is enabled on the Enable/Disable Features (CS100000) form. |
| To Location | The destination warehouse location to which the materials are to be transferred. You can select only locations for which transfers are allowed. This box appears if Create Material Transfer is selected in the Action box and the Multiple Warehouse Locations feature is enabled on the Enable/Disable Features (CS100000) form. |
| Inventory ID | The inventory item for which material lines are listed in the table. |
| List | A button you can click to open the Inventory Item List dialog box. If you select multiple inventory items in this dialog box, the table lists only material lines with these inventory IDs. |
| Element | Description |
|---|---|
| Inventory ID |
The inventory item whose material lines are to be listed in the table if the item is selected. |
| Description |
A brief description of the inventory item. |
Table
The table lists the material lines that meet the criteria specified in the Selection area and are eligible for the action selected in the Action box.
| Column | Description |
|---|---|
| Included | An unlabeled check box that you select to include the material line in the processing of the operation selected in the Action box when you click Process. |
| Document Type | The type of source document that contains the material line: Project or Work Order. |
| Document ID | The identifier of the source document that contains the material line. |
| Inventory ID | The identifier of the inventory item specified in the material line. If Create Material Transfer is selected in the Action box, only stock items are listed. |
| Description | The description of the inventory item. |
| Line Status |
The status of the material line. |
| Warehouse | The source warehouse—that is, the warehouse from which the item will be issued, shipped, or transferred. |
| To Warehouse | The destination warehouse specified in the material line. This column is displayed if Create Material Transfer is selected in the Action box and the Multiple Warehouses feature is enabled on the Enable/Disable Features (CS100000) form. |
| To Location | The destination warehouse location specified in the material line. This column is displayed if Create Material Transfer is selected in the Action box and the Multiple Warehouse Locations feature is enabled on the Enable/Disable Features (CS100000) form. |
| UOM |
The unit of measure for the required item quantity. By default, the system inserts the unit of measure specified in the related material line of the source document. |
| Required Qty. | The quantity of the item required for the source document. |
| Qty. Procured | The quantity of the item that has been procured or allocated for the material line. |
| Qty. Available for Dispatch | The quantity of the item currently available for dispatch. |
| Qty. on Dispatch | The quantity of the item included in open material issues or material shipments. Material transfers are not included in this quantity. |
| Qty. Dispatched | The quantity of the item already dispatched through confirmed material issues or material shipments. Material transfers are not included in this quantity. |
| Qty. Used | The quantity of the item used for the project or work order. |
| Dispatch On | The date on which the item is scheduled to be dispatched. |
| Needed By | The date by which the item is needed for the project or work order. |